After your contract is signed, the job is turned over to production to schedule, and order materials.
Production will calculate for the materials necessary to install your new roof, and a percentage is added for error.
This new total amount is ordered, knowing full well that things happen. It is a show stopper to be a bundle of shingles short. It is just an inconvenience to take back unused shingles. Having extra materials is a defense against not having enough materials.
This is the same for starter shingles, ridge cap, drip edge, Underlayment, ICE & Water, etc.
Usually left over materials will be picked up the same day the roof is completed, but it is entirely possible that it could be the following day.